Shoener Environmental - Engineering, Environmental and Energy
  • Home
  • Engineering
  • Environmental
    • Ecology & Wildlife
    • Wetlands
    • Permitting
    • Post-construction
    • Site Assessment
    • GIS Mapping and Survey
  • Energy Markets
    • Wind
    • Solar
    • Hydro Electricity
    • Natural Gas
  • Projects
    • Waymart Wind Farm
    • Ocotillo Wind Farm
    • Orangeville Wind Farm
    • Franklin County Solar Farm
    • Seneca Hydroelectric Plant
    • Harrisburg-Allentown Fiber Optic Line
  • About Us
    • Our Team
    • Locations
    • News
    • Careers
    • Contact Us

Permitting

Shoener’s comprehensive site assessment and permitting services will provide specialized assistance from project design, through regulatory and public presentations, to final approval. More than providing good technical advice, Shoener helps you find a strategy to work your way through the regulatory maze to get your project built. Our staff has held federal and state government management positions, so we understand what it takes to obtain project approval from regulatory agencies.

Shoener has become recognized as the go-to expert in stormwater management, design and permitting for renewable energy projects. In Pennsylvania, Shoener has been involved with the permitting of over 20 wind farms and provided consulting services for over 70% of the State's wind energy projects.

No project is too big or too small. Shoener can help obtain permits for large, complex utility projects to small, simple residential buildings. For example, we have helped clients on large wind energy facilities with over eighty wind turbines to simple residential driveways that require a single permit to cross a small stream.

Environmental Permitting services include:
  • National Pollutant Discharge Elimination System (NPDES) General and Individual Permits for point source and stormwater discharges
  • Erosion and Sediment Control Plans
  • Stormwater Pollution Prevention Plans (SWPPPs)
  • ESCGP-2 Permitting
  • Pennsylvania Chapter 105 General Permits and Water Obstruction and Encroachment Permits
  • Section 404 Nationwide Permits and Section 10 Permits
  • Section 401 Water Quality Certification
  • Highway Occupancy Permits (HOP)
  • Dam and Waterway Permits
  • Stream Restoration, Design and Permitting
  • Indiana Bat Protection and Enhancement (PEP) Plans 
  • Spill Prevention Control and Counter (SPCC) Plans
  • Prepared, Prevent and Contingency (PPC) Plans
Local Permitting services include:
  • Subdivision and Land Development Plan Approvals
  • Zoning Permits
  • Public Meetings and Hearing Testimony
  • Act 537 Sewage Planning
Wind Farm NPDES Permit
Natural Gas Construction Inspection

SHOENER ENVIRONMENTAL, INC.

Locations
​
About Us
570.489.6920 | Contact Us |
© 2017 Shoener Environmental, Inc. All rights Reserved. 
✕